- EPC of petroleum storage facilities of 187,500 cbm
- Total of 9 carbon steel tanks
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation works
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps and motors etc
- Civil works include foundation, bund wall, pipe racks, sleepers, sewer system etc
- Equipment works include installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib & etc
- Erection of CS external floating roof tanks and CS fixed roof tanks with CS internal floating roofs
Project Type: Terminal
Oiltanking Odfjell Singapore – Chem 6 (12” Stainless Steel MEG Jetty Line to MJ10 Project and related facilities)
- Total storage facility of 60,000 cbm
- Total of 19 carbon steel fixed roof tanks, 1 marine jetty topside
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
- Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
- Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
- Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system
Oiltanking Odfjell Singapore – Chem 5 (PO Tanks and Chem 4 Tank Conversion Project)
- Total storage facility of 79,200 cbm
- Total of 7 numbers of carbon steel dome roof tanks, jetty topside, common facilities and utilities
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
- Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
- Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
- Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system
Tank Terminal & Jetty Topsides at Merak (West Java) Indonesia
- Basic engineering followed by the detailed engineering of the tank terminal and jetty topside facilities
- Vertical storage tanks laid out in 4 tank farms
- Total storage facility of 283,500 cbm
- Total of 21 tanks, 2 jetty top site facilities, truck loading facilities, 1 RC main & 4 Containerised S/S
- Tank capacities ranged from 200 cbm to 21,200 cbm
- Products stored include jet fuel, Mogas, Naphtha, MTBE, Gas Oil and Diesel
- Engineering achievement – the site was located within Seismic Zone 4 and all the facilities in the project were designed for seismic loading
Fujairah Oil Terminal
Electrical & Instrumentation Works:
- MV/LV Substation
- MV Motors
- Field Instruments
- Fire & Gas Detector
- Panel Integration
- PLC Programming
- SCADA Screen Development
- Sub-System Integration
- Factory Acceptance Test
- Site Erection and Commissioning
- Training & Documentation
Universal Terminal – Crude and Petroleum Storage & its Related Services
- Single phase EPC Project of 2.3 million cbm of Petroleum Storage Terminal Facilities completed in 22 months
- For storage of Crude Oil, Fuel Oil, Lube Oil, Marine Diesel Oil, Gas Oil, Mogas, Naphtha, Jet Fuel
- 70 numbers of Product tanks, including 36 Aluminum Dome Roof Tanks and 34 External Floating Roof Tanks
- 3 numbers of waste water tanks
- Approximately 620,000 diameter-inch of piping works, 45,000 tons of carbon steel plates
- Engineering scope consists of FEED to as-built drawings
- Major achievements in Engineering such as impounding basin design for 6 numbers of 100,000 cbm tanks with optimization of land area done in accordance to code requirements
- Engineering design was done before land reclamation was completed
Fujairah Oil Terminal
- Total storage capacity of 1.15 million cbm
- Product storage tanks 34 nos., slop tanks 2 nos., utilities tanks 4 nos.
- Product jetty pipelines
- Common facilities & utilities, including E&I works
- Building works including administration building & substation