Oiltanking Singapore – Phase 7 Expansion

  • EPC of petroleum storage facilities of 187,500 cbm
  • Total of 9 carbon steel tanks
  • Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation works
  • Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps and motors etc
  • Civil works include foundation, bund wall, pipe racks, sleepers, sewer system etc
  • Equipment works include installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib & etc
  • Erection of CS external floating roof tanks and CS fixed roof tanks with CS internal floating roofs

Oiltanking Odfjell Singapore – Chem 6 (12” Stainless Steel MEG Jetty Line to MJ10 Project and related facilities)

  • Total storage facility of 60,000 cbm
  • Total of 19 carbon steel fixed roof tanks, 1 marine jetty topside
  • Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
  • Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
  • Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
  • Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
  • Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system

Oiltanking Odfjell Singapore – Chem 5 (PO Tanks and Chem 4 Tank Conversion Project)

  • Total storage facility of 79,200 cbm
  • Total of 7 numbers of carbon steel dome roof tanks, jetty topside, common facilities and utilities
  • Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
  • Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
  • Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
  • Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
  • Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system

Tank Terminal & Jetty Topsides at Merak (West Java) Indonesia

  • Basic engineering followed by the detailed engineering of the tank terminal and jetty topside facilities
  • Vertical storage tanks laid out in 4 tank farms
  • Total storage facility of 283,500 cbm
  • Total of 21 tanks, 2 jetty top site facilities, truck loading facilities, 1 RC main & 4 Containerised S/S
  • Tank capacities ranged from 200 cbm to 21,200 cbm
  • Products stored include jet fuel, Mogas, Naphtha, MTBE, Gas Oil and Diesel
  • Engineering achievement – the site was located within Seismic Zone 4 and all the facilities in the project were designed for seismic loading

Fujairah Oil Terminal

Electrical & Instrumentation Works:

  • MV/LV Substation
  • MV Motors
  • Field Instruments
  • Fire & Gas Detector
  • Panel Integration
  • PLC Programming
  • SCADA Screen Development
  • Sub-System Integration
  • Factory Acceptance Test
  • Site Erection and Commissioning
  • Training & Documentation

Universal Terminal – Crude and Petroleum Storage & its Related Services

  • Single phase EPC Project of 2.3 million cbm of Petroleum Storage Terminal Facilities completed in 22 months
  • For storage of Crude Oil, Fuel Oil, Lube Oil, Marine Diesel Oil, Gas Oil, Mogas, Naphtha, Jet Fuel
  • 70 numbers of Product tanks, including 36 Aluminum Dome Roof Tanks and 34 External Floating Roof Tanks
  • 3 numbers of waste water tanks
  • Approximately 620,000 diameter-inch of piping works, 45,000 tons of carbon steel plates
  • Engineering scope consists of FEED to as-built drawings
  • Major achievements in Engineering such as impounding basin design for 6 numbers of 100,000 cbm tanks with optimization of land area done in accordance to code requirements
  • Engineering design was done before land reclamation was completed

Fujairah Oil Terminal

  • Total storage capacity of 1.15 million cbm
  • Product storage tanks 34 nos., slop tanks 2 nos., utilities tanks 4 nos.
  • Product jetty pipelines
  • Common facilities & utilities, including E&I works
  • Building works including administration building & substation