Maxphalt Bitumen Project

  • Full Shop Tank fabrication (2 nos) include PWHT (Post Weld Heat Treatment)
  • 3rd heavy lift project of shop fabricated tanks (9000cbm each)
  • With diameter of 22.5m and standing at 28m high & Lifted with a 5,000MT SWL Sheerleg Floating Crane

Thai Oil – TOP New Tank Project

  • Basic and detailed engineering for 5 nos. of atmospheric tanks
  • Tank diameter is 30, 36, 39 and 60 meter respectively
  • 2 nos. of 60 meter diameter with Aluminium Geodesic Dome  Roof/Internal Floating  Roof Full Face Contact (GRE : Glass Reinforced Epoxy Type)
  • 2 nos. of 30 and 39 meter diameters with Fixed Cone Roof/Internal Floating Roof Full Face Contact (GRE : Glass Reinforced Epoxy Type) and other 36 meter diameter with Fixed Cone Roof
  • Total capacity – 180,000 cbm
  • Tanks (empty weight) – 3,450 Tons
  • Atmospheric tanks products: Jet A1, Gasoil, MOGAS, TCP
  • Safety man-hours w/o LTI – 420,000 mhrs
  • Design and supply of materials, fabrication and erection of tanks, testing and inspection.

Arkema Lychee Project

The electrical installation work scopes for this project comprises supply of non-free-issue materials, installation, testing & commissioning of electrical equipment and systems in the substations. The work scopes in process & offsite utility areas are as follows.

  • Motor control stations
  • Power junction boxes
  • Welding & power socket outlets
  • Convenience outlets
  • Power & control cables
  • Termination kits, cable glands, termination sockets and all accessories to complete cable installation
  • Cable ladders, trays, support for cable ladders and trays below 300 mm & accessories
  • Complete outdoor lighting system including but not limited to light fittings, street lighting, fence lighting, plant area lighting, lighting cables, JBs & accessories
  • Aboveground earthing system
  • Lightning protection System
  • Heat tracing system

XSBR Project – Mechanical, Piping, Electrical & Instrumentation Works

Mechanical & Piping Works:

  • To provide scaffolding for equipment and piping installation as necessary.
  • Supply and installation of holding down/ anchor bolts, studs, washers and nuts where not provided but deemed necessary for installation of equipment piping and structures on concrete foundations/plinths.
  • Shop/Field fabrication or modification, erection, testing and painting of new pipe works.
  • Supply material, fabricate, galvanizing, and erection of pipe supports.

 

Electrical Works:

  • Motor starter
  • Motor Control Station (MCS)
  • Power Supply for Pumps, Package Unit and Lighting & Power Distribution Board
  • Cable Supply & Installation
  • Cable Tray/Ladders Supply & Installation
  • Cable Termination
  • Grounding
  • Testing and Commissioning

 

Instrumentation Works:

  • Control Panel In DCS room
  • Instrument Installation
  • Junction Box Installation
  • Cable Tray/Ladder Installation
  • Cable Installation and Termination
  • Instrument Earthing and Bonding
  • Instrument Air Header and Tubing Installation
  • Relocation of Existing Instruments

 

Inspection and Testing