Oiltanking – MJ22 Jetty Phase 6 Project

  • Design & build of new jetty MJ22 to handle vessels up to 75,000 DWT and supply and installation of jetty topside facilities including piping and E&I works
  • 3 nos. marine loading arm, 1 no. gangway with jib crane and 4 nos. pumps
  • 1400 DB shop fabrication & field installation of pipes
  • 8 main pipelines for transporting mogas, gasoil, gas fuel, and MTBE. Combined maximum flow rate of 6,000 m3/hr