RotaryTerminalUniversal Terminal – Crude and Petroleum Storage & its Related Services Universal Terminal – Crude and Petroleum Storage & its Related Services
- Single phase EPC Project of 2.3 million cbm of Petroleum Storage Terminal Facilities completed in 22 months
- For storage of Crude Oil, Fuel Oil, Lube Oil, Marine Diesel Oil, Gas Oil, Mogas, Naphtha, Jet Fuel
- 70 numbers of Product tanks, including 36 Aluminum Dome Roof Tanks and 34 External Floating Roof Tanks
- 3 numbers of waste water tanks
- Approximately 620,000 diameter-inch of piping works, 45,000 tons of carbon steel plates
- Engineering scope consists of FEED to as-built drawings
- Major achievements in Engineering such as impounding basin design for 6 numbers of 100,000 cbm tanks with optimization of land area done in accordance to code requirements
- Engineering design was done before land reclamation was completed