Singapore Parallel Train
Electrical works:
- Utility Substations with MV Transformers & LV Transformers
- Air Cooler & Olefins Substations with MV Transformers & LV Transformers
- 120MW Gas Turbine Generators (GE Make) with 150MVA GSU Transformers
- Auxiliary Transformers & Iso-Phase Bus Duct System
- GTG Migration
- GLAC Erection/Installation Check
- GNAC Erection/Installation Check
- MV Motors (6.6kV) & LV Motors (433V)
- MV & LV Switchgears
- MCCs & Distribution Panels
- Plant Lighting & Power System
- Cathodic Protection System
- Electrical Heat Tracing System
- Cable Ladder / Tray System
- UPS System / Battery
- Grounding System
- Standby Generator
- Substation System
- Preservation
Instrumentation works:
- Instrument Cable System
- Air Supply Tubing System
- Loop Foder / Assembly Procedure
- RIE Installation
- Analyzer Container Installation
- Instrument Calibration