Shell Mono Ethylene Glycol (MEG) Plant
- EPC works for 750,000 cbm TPA Mono Ethylene Glycol (MEG) downstream plant in Jurong Island
- Scope of work include mechanical construction, piping & equipment installation
- Shop fabrication & field Installation of estimated 200,000 DB of pipes
- Pipe sizes range from 2” to 88”
- Equipment installation of 486 nos. ranging from 2 tons to 1,200 tons
- Engineering lifting studies for heavy lifts & piping spoolgen drawings for shop fabrication