Project Showcase
Types of Project
Types of Work
Regions
Results for "Region > Singapore"
Singapore LNG Terminal – Temporary Truck Loading Facility
Jurong Island, Singapore
Singapore Lube Park Pte Ltd, Lube Park Shared Facility – EPC Package A
Singapore
Singapore Parallel Train
Jurong Island, Singapore
SRC Mogas Cogen Plant
Jurong Island, Singapore
Stepan Asia Pte Ltd – Stepan Phase 1 Project
Jurong Island, Singapore
Symphony Project – E&I Works Package 1&2
Jurong Island, Singapore
Tank Upgrading at Vopak at Sebarok Terminal, Sebarok Island
Sebarok Island, Singapore
TOTAL Oil Asia-Pacific – Lube Oil Blending Plant
Tuas, Singapore
Universal Terminal – Crude and Petroleum Storage & its Related Services
Jurong Island, Singapore
Singapore LNG Terminal – Temporary Truck Loading Facility
- PROJECT DESCRIPTION
- 1 no. loading facility for LNG trucks
- Detailed engineering works for custody skid & LNG impoundment basin
- Integrating of loading facility to the existing terminal (piping tie in works and E&I works)
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Singapore LNG Corporation
LOCATION: Jurong Island, Singapore
OWNER: Singapore LNG Corporation
DURATION: Jan 2016 - Dec 2016
Singapore Lube Park Pte Ltd, Lube Park Shared Facility – EPC Package A
- PROJECT DESCRIPTION
- 158,640 cbm product storage capacity
- 77 storage tanks for base oil / finished product / additive
- 1 Marine jetty (2 vessel berths + 2 barge berths) topside works
- Common facilities & utilities, including Electrical & Instrumentation works
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Singapore Lube Park Pte Ltd
LOCATION: Singapore
OWNER: Singapore Lube Park Pte Ltd
DURATION: Jul 2013 - Feb 16
Singapore Parallel Train
- PROJECT DESCRIPTION
- 337,000 DB piping fabrication & erection works
- 7,900 tons of steel structure erection
- 127,000 DB of small bore fabrication works
- 667 units of equipment installation
- Underground piping works including excavation, backfilling, concrete & steel bar reinforcement
- Electrical & instrumentation works
SCOPE OF WORK:
Construction Services:
- Civil
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Shaw Stone & Webster Asia Inc
LOCATION: Jurong Island, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Jul 2009 - Apr 2013
SRC Mogas Cogen Plant
- PROJECT DESCRIPTION
Electrical works:
- Electrical Equipment Installation
- Electrical Testing
- Transformer Modification
- ISO-Phase Bus Duct Installation
- Refinery Lighting
- 22kV Live Cables Trench Excavation
- Electrical Cable Splicing , Termination & OWTS Testing’s
- 22kV Cut-Over Works w/ Cogen Sub Station
- Site Erection and Commissioning
SCOPE OF WORK:
Procurement & Construction:
- Electrical works
- Testing & commisioning
CLIENT: JGC Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Singapore Refining Company Pte Ltd
DURATION: Aug 2015 - Dec 2016
Stepan Asia Pte Ltd – Stepan Phase 1 Project
- PROJECT DESCRIPTION
Construction of a five-storey 50,000 tons (expandable to 100,000 tons) per year (“TPY”) Fractionated Methyl Ester (“ME”) plant
Also upgrading of an existing ME plant on Jurong Island.
Works include the addition of tanks, cooling tower, air compressor, fire-fighting facilities
Related facilities involving civil, structural, mechanical, piping, electrical and instrumentation works.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Stephan Asia Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Stephan Asia Pte Ltd
DURATION: Jan 2011 - Feb 2012
Symphony Project – E&I Works Package 1&2
- PROJECT DESCRIPTION
Construction of double wall tank
SCOPE OF WORK:
•OSBL Substation
•Polymer Substation
•Monier Substation
•Sector 5000 & CO/ Utilities
•Sector 4000 & CO/ Utilities
•Sector 2000 & 3000CLIENT: Wood
LOCATION: Jurong Island, Singapore
OWNER: Arkema Pte Ltd
DURATION: March 2021 - March 2022
Tank Upgrading at Vopak at Sebarok Terminal, Sebarok Island
- PROJECT DESCRIPTION
- Tank Upgrading Works For 27 Tanks
- Tank Jacking, Tank Foundation Repair, Annular & Bottom Plate Repair & Replacement, Aluminum IFR Removal & Replacement, Drencher & Foam Line Removal & Replacement
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Civil
- Tankage
- Piping & Structures
CLIENT: Vopak Terminals Singapore Pte Ltd
LOCATION: Sebarok Island, Singapore
OWNER: Vopak Terminals Singapore Pte Ltd
DURATION: Aug 2017 - Jun 2020
TOTAL Oil Asia-Pacific – Lube Oil Blending Plant
- PROJECT DESCRIPTION
- 300,000 MTPA lube oil blending plant
- 39 nos. of tanks in the tank farms
- 80,000 DB of piping works, including pipe lines to the shared facility
- Production building, truck loading and unloading bays, office building with parking facilities, miscellaneous buildings and utilities
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Total Oil Asia-Pacific Pte Ltd
LOCATION: Tuas, Singapore
OWNER: Total Oil Asia-Pacific Pte Ltd
DURATION: Jul 2013 - Jul 2015
Universal Terminal – Crude and Petroleum Storage & its Related Services
- PROJECT DESCRIPTION
- Single phase EPC Project of 2.3 million cbm of Petroleum Storage Terminal Facilities completed in 22 months
- For storage of Crude Oil, Fuel Oil, Lube Oil, Marine Diesel Oil, Gas Oil, Mogas, Naphtha, Jet Fuel
- 70 numbers of Product tanks, including 36 Aluminum Dome Roof Tanks and 34 External Floating Roof Tanks
- 3 numbers of waste water tanks
- Approximately 620,000 diameter-inch of piping works, 45,000 tons of carbon steel plates
- Engineering scope consists of FEED to as-built drawings
- Major achievements in Engineering such as impounding basin design for 6 numbers of 100,000 cbm tanks with optimization of land area done in accordance to code requirements
- Engineering design was done before land reclamation was completed
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Universal Terminal Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Universal Terminal Pte Ltd
DURATION: Dec 2005 - Oct 2007