PB Tankers Limited, Phase 6 Storage Tanks Development
Pulau Busing, Singapore
Port of Fujairah – VLCC Jetty No. 1
Fujairah, UAE
Proposed Petroleum Storage & Handling Facilities For Jurong Port Tank Terminals (Phase 1) At Jurong Port
Jurong Port Rd, Singapore
Proposed Petroleum Storage and Handling Facilities (Phase 2) for JPTT at Jurong Port
Singapore
Provision for Engineering, Procurement, Construction & Commissioning of PC 12409 for MLNG – ...
Bintulu, Sarawak
PTT Tank Terminal – Ammonia Storage Tank & Facilities Project
Rayong, Thailand
PTTLNG Nong Fab Receiving Terminal Project
Map Ta Phut , Thailand
SABIC (SHARQ) – SHARQ 3rd Expansion
Jubail, Saudi Arabia
SATORP (Package 6 – Refinery Tank Farm)
Jubail, Saudi Arabia
PB Tankers Limited, Phase 6 Storage Tanks Development
- PROJECT DESCRIPTION
- Total storage capacity – 790,000 cbm
- Total of 14 black product tanks for Shell, 4 black product tanks for Tankstore, 6 white product tanks
- Product – black product (fuel oil, low Sulphur fuel oil), white product (Mogas, Diesel, Kerosene)
- Construction of 4 tank pits for black product, 1 tank pit for white product, 1 pump station & valve manifold and jetty topside works for extension of current jetty 6 to 2 new jetties (Jetty 6A/6B)
- Detailed engineering work for tankage, civil & structure, mechanical equipment, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, pumps, knock out drum, marine loading arm, hot oil heater, chemical dosing unit, side entry & etc
- Mixers, corrugated plate interceptor, electrical cables, field instruments, tubing, fire fighting equipment, new panels, tank gauging system and metering skid
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: PB Tankers Limited
LOCATION: Pulau Busing, Singapore
OWNER: PB Tankers Limited
DURATION: Feb 2013 - Dec 2016
Port of Fujairah – VLCC Jetty No. 1
- PROJECT DESCRIPTION
- Marine and jetty topside works
- 2.6 km twin crude lines 40” size
- Firefighting and utility
- Piping works (approx. 65000 DB)
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Port of Fujairah
LOCATION: Fujairah, UAE
OWNER: Port of Fujairah
DURATION: Sep 2014 - Jul 2016
Proposed Petroleum Storage & Handling Facilities For Jurong Port Tank Terminals (Phase 1) At Jurong Port
- PROJECT DESCRIPTION
- Construction of a tank farm with 19 numbers of tanks for clean petroleum products storage, pump stations, valve manifolds, firefighting system, slop and waste water system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank Terminal to Oiltanking’s tank terminal
- Total storage facility of 232,000 cbm with potential to add another 230,000 cbm
- Supported by 4 jetty berths with 16 meter draft and can facilitate vessel berthing up to 120,000 deadweight ton. The scope includes installation 6 numbers of marine loading arms and gangway tower with jib crane
- Building works include CCR & admin building, warehouse & workshop and substation
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Jurong Port Tank Terminals Pte Ltd
LOCATION: Jurong Port Rd, Singapore
OWNER: Jurong Port
DURATION: Jul 2017 - Oct 2019
Proposed Petroleum Storage and Handling Facilities (Phase 2) for JPTT at Jurong Port
- PROJECT DESCRIPTION
- Construction of a proposed terminal with 19 number of tanks suitable for the storage, transfer and blending of petroleum products, valve manifolds, firefighting system, slop and wastewater system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank.
- A total capacity of 310,000 cmb with no new jetties in Phase 2 scope. Supported by Phase 1 existing jetties.
SCOPE OF WORK:
Engineering Design,
Procurement and Construction:
1.Civil
2.Tankage
3.Piping & Structures
4.Equipment Installation
5.Electrical & Instrumentation
CLIENT: Jurong Port Tank Terminals Pte Ltd
LOCATION: Singapore
OWNER: Jurong Port Tank Terminals Pte Ltd
DURATION: Sept 2019 - Oct 2022
Provision for Engineering, Procurement, Construction & Commissioning of PC 12409 for MLNG – Bintulu, Sarawak, Malaysia
- PROJECT DESCRIPTION
Mechanical & Piping:
- Required to supply of management, manpower, tools, equipment, transportation, consumable and PPE.
- Supply crane, trailer & lorry crane for the lifting works and supply all lifting equipment such as chain block, shackle and sling belt.
- Supply of welding generator (Diesel driven) accessories and consumable.
- All temporary spades and blinds
- Torque Machine and manual torque tool
- Carry out hydrotest
- Fabricate & install pipe support and piping
- Control valve removal installation new C/V
Electrical & Instrumentation Work:
- Supply of calibration equipment & Testing equipment
- Precommissioning works (Loop check & calibration)
- Control valve functional check new c/v
- Supply of welding generator accessories and consumables
- Fabricate and install pipe support
Automation DCS Works in MFS2, MPCC Control room scope limited to serial link connection from LCP to MFS2, Development of Graphics screen at MFS2.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Mechanical & piping
- Electricial & Instrumentation
CLIENT: Maser (M) Sdn Bhd
LOCATION: Bintulu, Sarawak
OWNER: Malaysia LNG Sdn Bhd
DURATION: Jan 2013 - Apr 2014
PTT Tank Terminal – Ammonia Storage Tank & Facilities Project
- PROJECT DESCRIPTION
- Total storage facility of 50,000 cbm
- Double wall tank (full containment) for liquid Ammonia (-34 degree celsius) including BOG
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Equipped with compressor unit, LP ground flare unit, marine loading arm, top side facilities of jetty and fire fighting facilities
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: PTT Tank Terminal Co. Ltd.
LOCATION: Rayong, Thailand
OWNER: PTT Tank Terminal Co. Ltd.
DURATION: Oct 2009 - Feb 2011
PTTLNG Nong Fab Receiving Terminal Project
- PROJECT DESCRIPTION
- 2 numbers of 250,000 cbm LNG Storage Tanks (90m Dia) full containment at -165 Degrees Celsius)
- Double wall API 620 tank – reinforced concrete outer wall, 9% Ni Carbon Steel inner wall
SCOPE OF WORK:
Construction of double wall tank
CLIENT: SPCC (Saipem-CTCI) JV
LOCATION: Map Ta Phut , Thailand
OWNER: SPCC (Saipem-CTCI) JV
DURATION: Aug 2019 - Dec 2022
SABIC (SHARQ) – SHARQ 3rd Expansion
- PROJECT DESCRIPTION
- EPC works for 9 nos. of tanks, of which five are site-erected tanks & four are shop-fabricated tanks
- All are cone roof tanks T-8640 (20 meter diameter by 20 meter height)
- BTX storage tank with internal aluminum floater
- Tanks were designed according to API 650 & roof were designed according to API 620 due to climate conditions
- Job scopes include all works related to tanks, such as level indicators, instruments & foam chambers
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
- Piping & Structures
CLIENT: Shaw Stone & Webster Arabia (Project Management Control)
LOCATION: Jubail, Saudi Arabia
OWNER: SABIC (SHARQ)
DURATION: Sep 2007 - Sep 2009
SATORP (Package 6 – Refinery Tank Farm)
- PROJECT DESCRIPTION
- Total storage capacity of 1.7 millions cbm
- Total of 62 ATM tanks and 8 bullet tanks
- Holds record for largest bullet tank in the world to have been assembled in the history of oil refinery, weighing 1,293 metric tons, 84 m long and an external diameter of 9 m
- Products stored include regular gasoline, RBOB gasoline, jet A1, diesel, benzene, paraxylene, propylene, C3 and / or C4, fuel oil, black material and naphtha
- Mechanical works include installation of 100 GC pumps, 4 positive displacement pumps, 88 mixers, 24 small tanks and vessels, 5 package units, 23 transformers, HVAC equipment
- Eelectrical & instrumentation works include new substations and lighting facilities, 3 instrument control rooms, FCR, PIB and PCR cabinets, cable routine, tank gauging systems, fire & gas detectors
- Commissioning supports
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Saudi Aramco Total Refining & Petrochemical Company
LOCATION: Jubail, Saudi Arabia
OWNER: Saudi Aramco Total Refining & Petrochemical Company
DURATION: Jul 2009 - Dec 2013