Project Showcase
Types of Project
Types of Work
Regions
Results for "Region > Singapore"
Oiltanking Odfjell Singapore – Chem 6 (12” Stainless Steel MEG Jetty Line to MJ10 Project and related ...
Jurong Island, Singapore
Oiltanking Odfjell Spherical Tanks – EPC 3 nos. of Spherical Tanks
Jurong Island, Singapore
Oiltanking Singapore – Phase 10 Expansion
Jurong Island Singapore
Oiltanking Singapore – Phase 7 Expansion
Jurong Island, Singapore
PB Tankers Limited, Phase 6 Storage Tanks Development
Pulau Busing, Singapore
Proposed Petroleum Storage & Handling Facilities For Jurong Port Tank Terminals (Phase 1) At Jurong Port
Jurong Port Rd, Singapore
Proposed Petroleum Storage and Handling Facilities (Phase 2) for JPTT at Jurong Port
Singapore
Provision of Maintenance & Repair Services – Evonik Methionine SEA Pte Ltd
Jurong Island, Singapore
Provision Of Maintenance Services – Lanxess Butyl Pte Ltd
Jurong Island, Singapore
Oiltanking Odfjell Singapore – Chem 6 (12” Stainless Steel MEG Jetty Line to MJ10 Project and related facilities)
- PROJECT DESCRIPTION
- Total storage facility of 60,000 cbm
- Total of 19 carbon steel fixed roof tanks, 1 marine jetty topside
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
- Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
- Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
- Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Oiltanking Odfjell Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Odfjell Singapore Ltd
DURATION: Feb 2008 - Jun 2009
Oiltanking Odfjell Spherical Tanks – EPC 3 nos. of Spherical Tanks
- PROJECT DESCRIPTION
- Total storage capacity – 12,000 cbm
- Product – 1,3 Butadiene
- Total of 3 spherical storage tanks, 1 marine loading arm at existing Jetty-12
- Detailed engineering work for Tankage, Civil & Structure, Mechanical Equipment, Piping, Electrical & Instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, pumps, knock out drum, marine loading arm, heat exchangers, dosing unit, electrical cables, field instruments, tubing, fire fighting equipment, new panels, tank gauging system
- Construction of 3 nos. spherical tanks (ID 20.2 meter), rundown line (5.3 kilometer) from PCS plant & feed line (12.5 kilometer) to Lanxess which to be run on common pipe corridor in Jurong island.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Oiltanking Odfjell Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Odfjell Singapore Ltd
DURATION: Apr 2013 - Dec 2014
Oiltanking Singapore – Phase 10 Expansion
- PROJECT DESCRIPTION
- Total storage capacity of 40,200 cbm
- Total of 8 dome roof tanks (white products) and 1 slop tank
- Civil works include tank foundations, substation, oil water separator, pipe sleeper, bund walls, pump foundation and road access
- Piping works include loading and receiving, SS304L pipeline to J10, wastewater pipeline, potable water pipeline, nitrogen pipeline, plant air pipeline and valves
- Mechanical works include installation of 2 x 500 m3 ship loading centrifugal pump, fire fighting system
- E&I works include substations, MOVs, terminal lighting and installation of PVRVs and ERVs
- Also assist in commissioning
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Oiltanking Singapore Ltd
LOCATION: Jurong Island Singapore
OWNER: Oiltanking Singapore Ltd
DURATION: Mar 2008 - Mar 2009
Oiltanking Singapore – Phase 7 Expansion
- PROJECT DESCRIPTION
- EPC of petroleum storage facilities of 187,500 cbm
- Total of 9 carbon steel tanks
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation works
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps and motors etc
- Civil works include foundation, bund wall, pipe racks, sleepers, sewer system etc
- Equipment works include installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib & etc
- Erection of CS external floating roof tanks and CS fixed roof tanks with CS internal floating roofs
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Oiltanking Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Singapore Ltd
DURATION: Dec 2005 - Dec 2006
PB Tankers Limited, Phase 6 Storage Tanks Development
- PROJECT DESCRIPTION
- Total storage capacity – 790,000 cbm
- Total of 14 black product tanks for Shell, 4 black product tanks for Tankstore, 6 white product tanks
- Product – black product (fuel oil, low Sulphur fuel oil), white product (Mogas, Diesel, Kerosene)
- Construction of 4 tank pits for black product, 1 tank pit for white product, 1 pump station & valve manifold and jetty topside works for extension of current jetty 6 to 2 new jetties (Jetty 6A/6B)
- Detailed engineering work for tankage, civil & structure, mechanical equipment, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, pumps, knock out drum, marine loading arm, hot oil heater, chemical dosing unit, side entry & etc
- Mixers, corrugated plate interceptor, electrical cables, field instruments, tubing, fire fighting equipment, new panels, tank gauging system and metering skid
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: PB Tankers Limited
LOCATION: Pulau Busing, Singapore
OWNER: PB Tankers Limited
DURATION: Feb 2013 - Dec 2016
Proposed Petroleum Storage & Handling Facilities For Jurong Port Tank Terminals (Phase 1) At Jurong Port
- PROJECT DESCRIPTION
- Construction of a tank farm with 19 numbers of tanks for clean petroleum products storage, pump stations, valve manifolds, firefighting system, slop and waste water system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank Terminal to Oiltanking’s tank terminal
- Total storage facility of 232,000 cbm with potential to add another 230,000 cbm
- Supported by 4 jetty berths with 16 meter draft and can facilitate vessel berthing up to 120,000 deadweight ton. The scope includes installation 6 numbers of marine loading arms and gangway tower with jib crane
- Building works include CCR & admin building, warehouse & workshop and substation
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Jurong Port Tank Terminals Pte Ltd
LOCATION: Jurong Port Rd, Singapore
OWNER: Jurong Port
DURATION: Jul 2017 - Oct 2019
Proposed Petroleum Storage and Handling Facilities (Phase 2) for JPTT at Jurong Port
- PROJECT DESCRIPTION
- Construction of a proposed terminal with 19 number of tanks suitable for the storage, transfer and blending of petroleum products, valve manifolds, firefighting system, slop and wastewater system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank.
- A total capacity of 310,000 cmb with no new jetties in Phase 2 scope. Supported by Phase 1 existing jetties.
SCOPE OF WORK:
Engineering Design,
Procurement and Construction:
1.Civil
2.Tankage
3.Piping & Structures
4.Equipment Installation
5.Electrical & Instrumentation
CLIENT: Jurong Port Tank Terminals Pte Ltd
LOCATION: Singapore
OWNER: Jurong Port Tank Terminals Pte Ltd
DURATION: Sept 2019 - Oct 2022
Provision of Maintenance & Repair Services – Evonik Methionine SEA Pte Ltd
- PROJECT DESCRIPTION
Provision of maintenance & repair services for mechanical & rotating equipment, electrical & instrumentation and HVAC.
SCOPE OF WORK:
Maintenance Services:
For mechanical, electrical & total maintenance
CLIENT: Evonik Methionine SEA Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionine SEA Pte Ltd
DURATION: Feb 2014 - Ongoing
Provision Of Maintenance Services – Lanxess Butyl Pte Ltd
- PROJECT DESCRIPTION
Provision of maintenance services for mechanical & rotating equipment, electrical & instrumentation and HVAC
SCOPE OF WORK:
Mechanical, Electrical, Scaffolding, Insulation Works
CLIENT: Lanxess Butyl Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Lanxess Butyl Pte Ltd
DURATION: Jun 2012 - Ongoing