Vopak Ethylene Tianjin Terminal Co. – Temparature Ethylene Terminal
Tianjin, China
Vopak Shanghai Logistics Co. – Vopak Multi Product Terminal
Shanghai, China
XSBR Project – Mechanical, Piping, Electrical & Instrumentation Works
Johor Bahru, Malaysia
BP Zhuhai Rock Cavern Project
Zhuhai, China
Chhara LNG Terminal Project
Gujarat, India
Vopak Ethylene Tianjin Terminal Co. – Temparature Ethylene Terminal
- PROJECT DESCRIPTION
- Engineering scope involved the detailed engineering of the facility
- The facility is an ethylene import/ export terminal
- 1 number refrigerated ethylene tank with a storage capacity of 15,000 cbm, ship unloading system and send-out system to the downstream plant
- Ethylene was stored at a temperature of approx -103oC
- The tank was designed as a single containment steel wall with perlite insulation system
- EPC work includes other facilities like control building, substation, etc
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Vopak Ethylene Tianjin Terminal Co. Ltd.
LOCATION: Tianjin, China
OWNER: Vopak Ethylene Tianjin Terminal Co. Ltd.
DURATION: Jul 2003 - Jul 2005
Vopak Shanghai Logistics Co. – Vopak Multi Product Terminal
- PROJECT DESCRIPTION
- Total of 62 numbers of chemical storage tanks of CS and SS material
- EPC work includes truck loading bay, drum filling room, pipe racks and jetty topsides
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical and instrumentation works
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps and motors etc
- Equipment works include installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Vopak Shanghai Logistics Co. Ltd
LOCATION: Shanghai, China
OWNER: Vopak Shanghai Logistics Co. Ltd
DURATION: Jan 2003 - Dec 2006
XSBR Project – Mechanical, Piping, Electrical & Instrumentation Works
- PROJECT DESCRIPTION
Mechanical & Piping Works:
- To provide scaffolding for equipment and piping installation as necessary.
- Supply and installation of holding down/ anchor bolts, studs, washers and nuts where not provided but deemed necessary for installation of equipment piping and structures on concrete foundations/plinths.
- Shop/Field fabrication or modification, erection, testing and painting of new pipe works.
- Supply material, fabricate, galvanizing, and erection of pipe supports.
Electrical Works:
- Motor starter
- Motor Control Station (MCS)
- Power Supply for Pumps, Package Unit and Lighting & Power Distribution Board
- Cable Supply & Installation
- Cable Tray/Ladders Supply & Installation
- Cable Termination
- Grounding
- Testing and Commissioning
Instrumentation Works:
- Control Panel In DCS room
- Instrument Installation
- Junction Box Installation
- Cable Tray/Ladder Installation
- Cable Installation and Termination
- Instrument Earthing and Bonding
- Instrument Air Header and Tubing Installation
- Relocation of Existing Instruments
Inspection and Testing
SCOPE OF WORK:
Construction Services:
- Mechanical & Piping
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Synthomer Sdn Bhd
LOCATION: Johor Bahru, Malaysia
OWNER: Synthomer Sdn Bhd
DURATION: Feb 2015 - Jul 2015
BP Zhuhai Rock Cavern Project
- PROJECT DESCRIPTION
EPC for 2 full containment underground LPG storage caverns in BP Phase 2 Expansion
Capacity of each cavern was 200,000 cbm
REL prepared and developed all LPG storage cavern mechanical engineering documentation. Scope included definition of piping, valve, instrument, electrical and control interfaces
All design calculations as required by codes, standards and documents as specified in the ITT and Functional Specification for the LPG Caverns shown in the drawings and specifications
General arrangement drawings, including details of openings, nozzle orientations, cavern sumps etc. Fabrication drawings, fabrication, transport, and installation procedures
REL performed a cavern repair and reinstatement portion in the later part of the project, due to mistakes by client’s underground contractor resulting in incomplete grouting of cavern plug. This involved dismantling casing within Butane shaft / down-hole sump area in preparation for the Cavern’s grouting repair works. This is a dangerous undertaking due to a confined space entry and the only point of entry is top-down
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Zhuhai JVO Arco Energy Co. Ltd
LOCATION: Zhuhai, China
OWNER: Zhuhai JVO Arco Energy Co. Ltd
DURATION: 2003 - 2006
Chhara LNG Terminal Project
- PROJECT DESCRIPTION
- 2 numbers of 185,000 cbm LNG Storage Tanks (86m Dia) full containment at -165 Degrees Celsius)
- Double wall API 620 tank – reinforced concrete outer wall, 9% Ni Carbon Steel inner wall
SCOPE OF WORK:
Construction of double wall tank
CLIENT: IHI Corporation
LOCATION: Gujarat, India
OWNER: HPCL Shapoorji Energy Private Limited
DURATION: 2020 - 2022