Vopak Ethylene Tianjin Terminal Co. – Temparature Ethylene Terminal
Tianjin, China
Vopak Shanghai Logistics Co. – Vopak Multi Product Terminal
Shanghai, China
Vopak Ethylene Tianjin Terminal Co. – Temparature Ethylene Terminal
- PROJECT DESCRIPTION
- Engineering scope involved the detailed engineering of the facility
- The facility is an ethylene import/ export terminal
- 1 number refrigerated ethylene tank with a storage capacity of 15,000 cbm, ship unloading system and send-out system to the downstream plant
- Ethylene was stored at a temperature of approx -103oC
- The tank was designed as a single containment steel wall with perlite insulation system
- EPC work includes other facilities like control building, substation, etc
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Vopak Ethylene Tianjin Terminal Co. Ltd.
LOCATION: Tianjin, China
OWNER: Vopak Ethylene Tianjin Terminal Co. Ltd.
DURATION: Jul 2003 - Jul 2005
Vopak Shanghai Logistics Co. – Vopak Multi Product Terminal
- PROJECT DESCRIPTION
- Total of 62 numbers of chemical storage tanks of CS and SS material
- EPC work includes truck loading bay, drum filling room, pipe racks and jetty topsides
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical and instrumentation works
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps and motors etc
- Equipment works include installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Vopak Shanghai Logistics Co. Ltd
LOCATION: Shanghai, China
OWNER: Vopak Shanghai Logistics Co. Ltd
DURATION: Jan 2003 - Dec 2006