Project Showcase
Types of Project
Types of Work
Regions
Results for "EPC/Multi-discipline"
Nexsol Singapore – Nexsol Biodiesel Plant
Singapore
Oiltanking – MJ22 Jetty Phase 6 Project
Jurong Island, Singapore
Oiltanking – TF5 Propylene Bullet Tank Storage and Its Related Facilities
Jurong Island, Singapore
Oiltanking Odfjell Singapore – Chem 5 (PO Tanks and Chem 4 Tank Conversion Project)
Jurong Island, Singapore
Oiltanking Odfjell Singapore – Chem 6 (12” Stainless Steel MEG Jetty Line to MJ10 Project and related ...
Jurong Island, Singapore
Oiltanking Odfjell Spherical Tanks – EPC 3 nos. of Spherical Tanks
Jurong Island, Singapore
Oiltanking Singapore – Phase 10 Expansion
Jurong Island Singapore
Oiltanking Singapore – Phase 7 Expansion
Jurong Island, Singapore
Padauk Shwe War Terminal
Myanmar
Nexsol Singapore – Nexsol Biodiesel Plant
- PROJECT DESCRIPTION
- Plant capacity: Biodiesel 100,000 TPA, Glycerine 10,000 TPA
- EPC of bio-diesel plant and its related facilities
- Detailed engineering work for civil, structural, piping, tankage, equipment sizing, electrical & instrumentation works
- Procurement of tank farm equipment such as pumps, loading arms & utility equipment, firefighting equipment, tank plates, tank accessories, piping, fittings, valves, electrical bulk material and equipment & instruments
- Civil works include site preparation, process plant, tank pad, paraquet wall, pipe sleepers & etc
- Structural works include fabrication & installation of process plant structure, platforms, pipe supports, pipe bridge & etc
- Installation & alignment of the mechanical equipment
- Optimization of equipment usage, ease of installation work by proper sequencing of process plant equipment & pipe installation sequence
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Nexsol Singapore Pte Ltd
LOCATION: Singapore
OWNER: Nexsol Singapore Pte Ltd
DURATION: Jul 2006 - Oct 2007
Oiltanking – MJ22 Jetty Phase 6 Project
- PROJECT DESCRIPTION
- Design & build of new jetty MJ22 to handle vessels up to 75,000 DWT and supply and installation of jetty topside facilities including piping and E&I works
- 3 nos. marine loading arm, 1 no. gangway with jib crane and 4 nos. pumps
- 1400 DB shop fabrication & field installation of pipes
- 8 main pipelines for transporting mogas, gasoil, gas fuel, and MTBE. Combined maximum flow rate of 6,000 m3/hr
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Piping
- Electrical & Instrumentation
CLIENT: Oiltanking Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Singapore Ltd
DURATION: Feb 2016 - May 2017
Oiltanking – TF5 Propylene Bullet Tank Storage and Its Related Facilities
- PROJECT DESCRIPTION
- EPC of 2 nos. of mounded bullet tanks – with 2800m3 capacity each and its associated piping, equipment, electrical & instrumentation systems
- Construction of 1 no. of 4″ feed line from Helios Terminal to end user
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Oiltanking Helios Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Helios Singapore Pte Ltd
DURATION: Jan 2017 - Dec 2018
Oiltanking Odfjell Singapore – Chem 5 (PO Tanks and Chem 4 Tank Conversion Project)
- PROJECT DESCRIPTION
- Total storage facility of 79,200 cbm
- Total of 7 numbers of carbon steel dome roof tanks, jetty topside, common facilities and utilities
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
- Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
- Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
- Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Oiltanking Odfjell Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Odfjell Singapore Ltd
DURATION: Sep 2007 - Dec 2008
Oiltanking Odfjell Singapore – Chem 6 (12” Stainless Steel MEG Jetty Line to MJ10 Project and related facilities)
- PROJECT DESCRIPTION
- Total storage facility of 60,000 cbm
- Total of 19 carbon steel fixed roof tanks, 1 marine jetty topside
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
- Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
- Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
- Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Oiltanking Odfjell Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Odfjell Singapore Ltd
DURATION: Feb 2008 - Jun 2009
Oiltanking Odfjell Spherical Tanks – EPC 3 nos. of Spherical Tanks
- PROJECT DESCRIPTION
- Total storage capacity – 12,000 cbm
- Product – 1,3 Butadiene
- Total of 3 spherical storage tanks, 1 marine loading arm at existing Jetty-12
- Detailed engineering work for Tankage, Civil & Structure, Mechanical Equipment, Piping, Electrical & Instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, pumps, knock out drum, marine loading arm, heat exchangers, dosing unit, electrical cables, field instruments, tubing, fire fighting equipment, new panels, tank gauging system
- Construction of 3 nos. spherical tanks (ID 20.2 meter), rundown line (5.3 kilometer) from PCS plant & feed line (12.5 kilometer) to Lanxess which to be run on common pipe corridor in Jurong island.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Oiltanking Odfjell Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Odfjell Singapore Ltd
DURATION: Apr 2013 - Dec 2014
Oiltanking Singapore – Phase 10 Expansion
- PROJECT DESCRIPTION
- Total storage capacity of 40,200 cbm
- Total of 8 dome roof tanks (white products) and 1 slop tank
- Civil works include tank foundations, substation, oil water separator, pipe sleeper, bund walls, pump foundation and road access
- Piping works include loading and receiving, SS304L pipeline to J10, wastewater pipeline, potable water pipeline, nitrogen pipeline, plant air pipeline and valves
- Mechanical works include installation of 2 x 500 m3 ship loading centrifugal pump, fire fighting system
- E&I works include substations, MOVs, terminal lighting and installation of PVRVs and ERVs
- Also assist in commissioning
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Oiltanking Singapore Ltd
LOCATION: Jurong Island Singapore
OWNER: Oiltanking Singapore Ltd
DURATION: Mar 2008 - Mar 2009
Oiltanking Singapore – Phase 7 Expansion
- PROJECT DESCRIPTION
- EPC of petroleum storage facilities of 187,500 cbm
- Total of 9 carbon steel tanks
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation works
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps and motors etc
- Civil works include foundation, bund wall, pipe racks, sleepers, sewer system etc
- Equipment works include installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib & etc
- Erection of CS external floating roof tanks and CS fixed roof tanks with CS internal floating roofs
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & Instrumentation
CLIENT: Oiltanking Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Singapore Ltd
DURATION: Dec 2005 - Dec 2006
Padauk Shwe War Terminal
- PROJECT DESCRIPTION
- EPC of a tank farm with 8 numbers of tank facility for storage of petroleum products
SCOPE OF WORK:
Engineering Design,
Procurement and Construction:
1.Civil
2.Tankage
3.Piping & Structures
4.Equipment Installation
5.Electrical & Instrumentation
CLIENT: Padauk Shwe War Port and Petroleum Co., Ltd
LOCATION: Myanmar
OWNER: Padauk Shwe War Port and Petroleum Co., Ltd
DURATION: Nov 2018 - Apr 2020