Jurong Synthetic Plant (Shop Fab & Site Erect)
Shipyard Road, Singapore
Jurong Synthetic Plant (Shop Fab)
Shipyard Road, Singapore
Leverage Ethylene Oxide Project
Jurong Island, Singapore
Neste Oil Singapore – Neste Biofuel Project
Tuas, Singapore
Neste Singapore Expansion Project
Singapore
Nexsol Singapore – Nexsol Biodiesel Plant
Singapore
Oiltanking – MJ22 Jetty Phase 6 Project
Jurong Island, Singapore
Oiltanking – TF5 Propylene Bullet Tank Storage and Its Related Facilities
Jurong Island, Singapore
Oiltanking Odfjell Singapore – Chem 5 (PO Tanks and Chem 4 Tank Conversion Project)
Jurong Island, Singapore
Jurong Synthetic Plant (Shop Fab & Site Erect)
- PROJECT DESCRIPTION
Shop fabrication and site erection of 10 nos. of cone roof tanks with 14,000 cbm storage capacity.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Aug 2015 - Apr 2016
Jurong Synthetic Plant (Shop Fab)
- PROJECT DESCRIPTION
Shop fabrication of 20 nos. of tanks with 2,400 cbm storage capacity.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Aug 2015 - Apr 16
Leverage Ethylene Oxide Project
- PROJECT DESCRIPTION
- 65,500 DB for shop & field piping installation
- 3,000 tons of steel structure
- 7,115 linear meter of pipe insulation
SCOPE OF WORK:
Construction:
- Piping & Structures
CLIENT: Chiyoda Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Shell Petroleum
DURATION: Jul 2013 - Nov 2014
Neste Oil Singapore – Neste Biofuel Project
- PROJECT DESCRIPTION
- Total of 11 tanks, including shop fabrication and site erection. Tank materials are CS, SS and duplex
- Total of 117,126 DB of piping fabrication and erection works
- Installation of 36 equipment totalling 207 tons
- Electrical & instrumentation works include grounding and lighting, installation of substation, cable tray, cable ladder, CP protection and heat tracing systems
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Technip
LOCATION: Tuas, Singapore
OWNER: Neste Oil Singapore
DURATION: Jul 2008 - Jun 2010
Neste Singapore Expansion Project
- PROJECT DESCRIPTION
- EPC of 22 no of tanks for Neste Singapore Plant Expansion
- Total capacity appx 180,000 cbm
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Tankage
- Electrical & Instrumentation
CLIENT: Neste Singapore Pte Ltd
LOCATION: Singapore
OWNER: Neste Singapore Pte Ltd
DURATION: Feb 2019 - Nov 2020
Nexsol Singapore – Nexsol Biodiesel Plant
- PROJECT DESCRIPTION
- Plant capacity: Biodiesel 100,000 TPA, Glycerine 10,000 TPA
- EPC of bio-diesel plant and its related facilities
- Detailed engineering work for civil, structural, piping, tankage, equipment sizing, electrical & instrumentation works
- Procurement of tank farm equipment such as pumps, loading arms & utility equipment, firefighting equipment, tank plates, tank accessories, piping, fittings, valves, electrical bulk material and equipment & instruments
- Civil works include site preparation, process plant, tank pad, paraquet wall, pipe sleepers & etc
- Structural works include fabrication & installation of process plant structure, platforms, pipe supports, pipe bridge & etc
- Installation & alignment of the mechanical equipment
- Optimization of equipment usage, ease of installation work by proper sequencing of process plant equipment & pipe installation sequence
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Nexsol Singapore Pte Ltd
LOCATION: Singapore
OWNER: Nexsol Singapore Pte Ltd
DURATION: Jul 2006 - Oct 2007
Oiltanking – MJ22 Jetty Phase 6 Project
- PROJECT DESCRIPTION
- Design & build of new jetty MJ22 to handle vessels up to 75,000 DWT and supply and installation of jetty topside facilities including piping and E&I works
- 3 nos. marine loading arm, 1 no. gangway with jib crane and 4 nos. pumps
- 1400 DB shop fabrication & field installation of pipes
- 8 main pipelines for transporting mogas, gasoil, gas fuel, and MTBE. Combined maximum flow rate of 6,000 m3/hr
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Piping
- Electrical & Instrumentation
CLIENT: Oiltanking Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Singapore Ltd
DURATION: Feb 2016 - May 2017
Oiltanking – TF5 Propylene Bullet Tank Storage and Its Related Facilities
- PROJECT DESCRIPTION
- EPC of 2 nos. of mounded bullet tanks – with 2800m3 capacity each and its associated piping, equipment, electrical & instrumentation systems
- Construction of 1 no. of 4″ feed line from Helios Terminal to end user
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Oiltanking Helios Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Helios Singapore Pte Ltd
DURATION: Jan 2017 - Dec 2018
Oiltanking Odfjell Singapore – Chem 5 (PO Tanks and Chem 4 Tank Conversion Project)
- PROJECT DESCRIPTION
- Total storage facility of 79,200 cbm
- Total of 7 numbers of carbon steel dome roof tanks, jetty topside, common facilities and utilities
- Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation
- Procurement of tank farm equipment such as steel plates, piping materials, electrical cables, instrument tubing, instrument gauges, pumps & motors etc
- Civil works include foundation, bund walls, pipe racks, sleepers, sewer system etc
- Installation of ship loading pumps, gangways, marine loading arms, fire monitor tower, jetty jib
- Design basis includes consideration of product (monoethylene gylcol), tankage, piping, product pumps & utilities, primary and secondary wastewater system
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Oiltanking Odfjell Singapore Ltd
LOCATION: Jurong Island, Singapore
OWNER: Oiltanking Odfjell Singapore Ltd
DURATION: Sep 2007 - Dec 2008