Project Showcase
Types of Project
Types of Work
Regions
Results for "Region > Singapore"
CCD (Singapore) – AAL and VAM Plant
Jurong Island, Singapore
Celanese VAE Project
Jurong Island, Singapore
Changi Airport Fuel Hydrant Installation (CAFHI)
Changi Airport Terminal 4, Singapore
Croda Alkoxylation Project
Jurong Island, Singapore
EVONIK ME5 Project (Electrical & Instrumentation Works)
Jurong Island, Singapore
EVONIK ME5 Project (Pipe Rack Module Work)
Jurong Island, Singapore
GMR Energy 2 x 400 MW CCP Project
Jurong Island , Singapore
Jurong Grease Plant
Shipyard Road, Singapore
Jurong Synthetic Plant
Shipyard Road, Singapore
CCD (Singapore) – AAL and VAM Plant
- PROJECT DESCRIPTION
Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation.
- Total storage facility of 60,000 cbm
- 325,000 DB of piping fabrication & erection works
- 4,400 tons of steel structure fabrication & erection and 11 stainless steel tanks
- 4,800 tons of equipment installation including towers & columns
- Electrical & instrumentation works
- Total of 19 nos. carbon steel fixed roof tanks, 1 marine jetty topsite
SCOPE OF WORK:
Construction:
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: CCD (Singapore) Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: CCD (Singapore) Pte Ltd
DURATION: Nov 2011 - Jun 2013
Celanese VAE Project
- PROJECT DESCRIPTION
- One no. of pre-fabricated substation (21 meter length x 9.5 meter width x 4.5 meter height)
- Electrical transformer & panel installation
- Instrument console & cabinet installation
- AS-I system, foundation field bus, profile bus, modes bus installation & testing
- Purchase & installation of cable ladder, lighting fixture, cable Pulling & etc
- EPC of HVAC system for warehouse, lift motor room & pre-fabricated containerized substation
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – HVAC & Containerised Substation
- Pre-commisioning, Testing & Commissioning
CLIENT: Celanese Singapore Emulsions Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Celanese Singapore Emulsions Pte Ltd
DURATION: Oct 2015 - Apr 2017
Changi Airport Fuel Hydrant Installation (CAFHI)
- PROJECT DESCRIPTION
Civil & mechanical works:
- 2 kilometer pipeline with capping beam
- 33 fuel hydrants
- 5,200 DB for shop & field piping installation
- Construction of 4 main valve chambers
- Underground piping works include sheet piling, reinforced concrete piling, excavation, backfilling, concrete & steel bar reinforcement
- Pipe-jacking for the tie-in area
- Pre-commissioning works
SCOPE OF WORK:
Construction & Pre-commisioning:
- Civil
- Piping
CLIENT: Changi Airport Fuel Hydrant Installation Pte Ltd
LOCATION: Changi Airport Terminal 4, Singapore
OWNER: Changi Airport Fuel Hydrant Installation Pte Ltd
DURATION: Jan 2015 - Feb 2017
Croda Alkoxylation Project
- PROJECT DESCRIPTION
Mechanical, structure & piping package
- 21,803 DB for shop & field piping installation
- 228 tons of steel structure
- 79 units of equipment installation
SCOPE OF WORK:
Construction:
- Piping & Structures
- Equipment Installation
CLIENT: Croda Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Croda Singapore Pte Ltd
DURATION: Jun 2014 - Feb 2015
EVONIK ME5 Project (Electrical & Instrumentation Works)
- PROJECT DESCRIPTION
Electrical works:
- LV Switch Room
- Electrical field equipment installation
- Lighting junction boxes
- Weather proof socket outlets
- Earthing and Lightning
Instrumentation works:
- Control room Equipments
- Field Instruments
- Instrument Junction boxes
- Instrument Air-headers
- Cable Glands for Instrument works
- ELV Installation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Jacobs Engineering Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionine SEA Pte Ltd
DURATION: May 2013 - Aug 2014
EVONIK ME5 Project (Pipe Rack Module Work)
- PROJECT DESCRIPTION
Mechanical, structure & piping package
- 20,000 DB for shop & field piping installation
- 1,000 tons of steel structure
- 2,500 linear meter piping insulation
- Supply, fabrication & insulation of cable tray in pipe rack modules
- 5,540 linear meter electrical cable & conduit works
- 2,160 linear meter instrument tray & conduit works
SCOPE OF WORK:
Construction:
- Piping & Structures
- Electrical & Instrumentation
CLIENT: Jacobs Engineering
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionie SEA Pte Ltd
DURATION: Jan 2013 - Sep 2014
GMR Energy 2 x 400 MW CCP Project
- PROJECT DESCRIPTION
- BOP Mechanical & Piping Works (PACKAGE 2)
- EPC 7 tanks for Fuel Oil, NeWater, Fire Water and Demin. Water (105,250 cbm); Tank construction works mainly include general fitting, welding works, Pipes and fittings erection.
- Shop fabrication and site erection of BOP piping (SS & CS) of around 55,000 DB.
- Site erection of heavy equipments of around 1,100 tons.
- Testing and pre-commissioning of the system to ensure plant readiness for energisation, and provide skilled manpower support to Samsung C&T (Main Contractor) for the commissioning works
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Tankage
- Mechanical & Piping
CLIENT: Samsung C&T
LOCATION: Jurong Island , Singapore
OWNER: Samsung GMR
DURATION: Sep 2011 - Jul 2013
Jurong Grease Plant
- PROJECT DESCRIPTION
- 52 nos. of shop fabricated tanks
- Production building
- Piping works, mechanical equipment installation
- Civil works including early works, substation building & etc.
- Electrical & instrumentation works
SCOPE OF WORK:
Procurement and Construction:
- Civil & Structural
- Tankage
- Piping & Structures
- Mechanical Equipment Installation
- Electrical & Instrumentation
CLIENT: Exxon Mobil Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Mar 2015 - Oct 2016
Jurong Synthetic Plant
- PROJECT DESCRIPTION
- Engineering ELV System
- Electrical work scope comprises supply of non free issue materials and installation, testing and commissioning of all electrical equipment including free issue and non free issue items, package electrics & systems
- Instrumentation work scope comprises supply of non free issue materials, calibration, installation, connecting, testing and pre-commissioning of instrument equipment and systems
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – ELV
- Pre-commissioning, Testing & Commissioning
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Feb 2016 - Jan 2017