Arkema Lychee Project
Terengganu, Malaysia
CCD (Singapore) – AAL and VAM Plant
Jurong Island, Singapore
Celanese VAE Project
Jurong Island, Singapore
Croda Alkoxylation Project
Jurong Island, Singapore
EVONIK ME5 Project (Electrical & Instrumentation Works)
Jurong Island, Singapore
EVONIK ME5 Project (Pipe Rack Module Work)
Jurong Island, Singapore
Jurong Grease Plant
Shipyard Road, Singapore
Jurong Synthetic Plant
Shipyard Road, Singapore
Jurong Synthetic Plant (Shop Fab & Site Erect)
Shipyard Road, Singapore
Arkema Lychee Project
- PROJECT DESCRIPTION
The electrical installation work scopes for this project comprises supply of non-free-issue materials, installation, testing & commissioning of electrical equipment and systems in the substations. The work scopes in process & offsite utility areas are as follows.
- Motor control stations
- Power junction boxes
- Welding & power socket outlets
- Convenience outlets
- Power & control cables
- Termination kits, cable glands, termination sockets and all accessories to complete cable installation
- Cable ladders, trays, support for cable ladders and trays below 300 mm & accessories
- Complete outdoor lighting system including but not limited to light fittings, street lighting, fence lighting, plant area lighting, lighting cables, JBs & accessories
- Aboveground earthing system
- Lightning protection System
- Heat tracing system
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Foster Wheeler (M) E & C Sdn Bhd
LOCATION: Terengganu, Malaysia
OWNER: Arkema Thiochemicals Sdn Bhd
DURATION: Aug 2013 - Jun 2014
CCD (Singapore) – AAL and VAM Plant
- PROJECT DESCRIPTION
Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation.
- Total storage facility of 60,000 cbm
- 325,000 DB of piping fabrication & erection works
- 4,400 tons of steel structure fabrication & erection and 11 stainless steel tanks
- 4,800 tons of equipment installation including towers & columns
- Electrical & instrumentation works
- Total of 19 nos. carbon steel fixed roof tanks, 1 marine jetty topsite
SCOPE OF WORK:
Construction:
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: CCD (Singapore) Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: CCD (Singapore) Pte Ltd
DURATION: Nov 2011 - Jun 2013
Celanese VAE Project
- PROJECT DESCRIPTION
- One no. of pre-fabricated substation (21 meter length x 9.5 meter width x 4.5 meter height)
- Electrical transformer & panel installation
- Instrument console & cabinet installation
- AS-I system, foundation field bus, profile bus, modes bus installation & testing
- Purchase & installation of cable ladder, lighting fixture, cable Pulling & etc
- EPC of HVAC system for warehouse, lift motor room & pre-fabricated containerized substation
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – HVAC & Containerised Substation
- Pre-commisioning, Testing & Commissioning
CLIENT: Celanese Singapore Emulsions Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Celanese Singapore Emulsions Pte Ltd
DURATION: Oct 2015 - Apr 2017
Croda Alkoxylation Project
- PROJECT DESCRIPTION
Mechanical, structure & piping package
- 21,803 DB for shop & field piping installation
- 228 tons of steel structure
- 79 units of equipment installation
SCOPE OF WORK:
Construction:
- Piping & Structures
- Equipment Installation
CLIENT: Croda Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Croda Singapore Pte Ltd
DURATION: Jun 2014 - Feb 2015
EVONIK ME5 Project (Electrical & Instrumentation Works)
- PROJECT DESCRIPTION
Electrical works:
- LV Switch Room
- Electrical field equipment installation
- Lighting junction boxes
- Weather proof socket outlets
- Earthing and Lightning
Instrumentation works:
- Control room Equipments
- Field Instruments
- Instrument Junction boxes
- Instrument Air-headers
- Cable Glands for Instrument works
- ELV Installation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Jacobs Engineering Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionine SEA Pte Ltd
DURATION: May 2013 - Aug 2014
EVONIK ME5 Project (Pipe Rack Module Work)
- PROJECT DESCRIPTION
Mechanical, structure & piping package
- 20,000 DB for shop & field piping installation
- 1,000 tons of steel structure
- 2,500 linear meter piping insulation
- Supply, fabrication & insulation of cable tray in pipe rack modules
- 5,540 linear meter electrical cable & conduit works
- 2,160 linear meter instrument tray & conduit works
SCOPE OF WORK:
Construction:
- Piping & Structures
- Electrical & Instrumentation
CLIENT: Jacobs Engineering
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionie SEA Pte Ltd
DURATION: Jan 2013 - Sep 2014
Jurong Grease Plant
- PROJECT DESCRIPTION
- 52 nos. of shop fabricated tanks
- Production building
- Piping works, mechanical equipment installation
- Civil works including early works, substation building & etc.
- Electrical & instrumentation works
SCOPE OF WORK:
Procurement and Construction:
- Civil & Structural
- Tankage
- Piping & Structures
- Mechanical Equipment Installation
- Electrical & Instrumentation
CLIENT: Exxon Mobil Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Mar 2015 - Oct 2016
Jurong Synthetic Plant
- PROJECT DESCRIPTION
- Engineering ELV System
- Electrical work scope comprises supply of non free issue materials and installation, testing and commissioning of all electrical equipment including free issue and non free issue items, package electrics & systems
- Instrumentation work scope comprises supply of non free issue materials, calibration, installation, connecting, testing and pre-commissioning of instrument equipment and systems
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – ELV
- Pre-commissioning, Testing & Commissioning
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Feb 2016 - Jan 2017
Jurong Synthetic Plant (Shop Fab & Site Erect)
- PROJECT DESCRIPTION
Shop fabrication and site erection of 10 nos. of cone roof tanks with 14,000 cbm storage capacity.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Aug 2015 - Apr 2016