GMR Energy 2 x 400 MW CCP Project
- BOP Mechanical & Piping Works (PACKAGE 2)
- EPC 7 tanks for Fuel Oil, NeWater, Fire Water and Demin. Water (105,250 cbm); Tank construction works mainly include general fitting, welding works, Pipes and fittings erection.
- Shop fabrication and site erection of BOP piping (SS & CS) of around 55,000 DB.
- Site erection of heavy equipments of around 1,100 tons.
- Testing and pre-commissioning of the system to ensure plant readiness for energisation, and provide skilled manpower support to Samsung C&T (Main Contractor) for the commissioning works