Celanese VAE Project
- One no. of pre-fabricated substation (21 meter length x 9.5 meter width x 4.5 meter height)
- Electrical transformer & panel installation
- Instrument console & cabinet installation
- AS-I system, foundation field bus, profile bus, modes bus installation & testing
- Purchase & installation of cable ladder, lighting fixture, cable Pulling & etc
- EPC of HVAC system for warehouse, lift motor room & pre-fabricated containerized substation