Oiltanking Singapore – Phase 10 Expansion
- Total storage capacity of 40,200 cbm
- Total of 8 dome roof tanks (white products) and 1 slop tank
- Civil works include tank foundations, substation, oil water separator, pipe sleeper, bund walls, pump foundation and road access
- Piping works include loading and receiving, SS304L pipeline to J10, wastewater pipeline, potable water pipeline, nitrogen pipeline, plant air pipeline and valves
- Mechanical works include installation of 2 x 500 m3 ship loading centrifugal pump, fire fighting system
- E&I works include substations, MOVs, terminal lighting and installation of PVRVs and ERVs
- Also assist in commissioning